SMART Base
0.2.0 - ci-build

SMART Base, published by WHO. This guide is not an authorized publication; it is the continuous build for version 0.2.0 built by the FHIR (HL7® FHIR® Standard) CI Build. This version is based on the current content of https://github.com/WorldHealthOrganization/smart-base/tree/main and changes regularly. See the Directory of published versions
Built from commit d97caff5.

: Can plan iterations - XML Representation

Draft as of 2026-03-20

Raw xml | Download


<Requirements xmlns="http://hl7.org/fhir">
  <id value="SGAuthoring.Skills.PlanIterations"/>
  <meta>
    <profile
             value="http://smart.who.int/base/StructureDefinition/SGRequirements"/>
  </meta>
  <text>
    <status value="generated"/>
    <div xmlns="http://www.w3.org/1999/xhtml"><div xml:lang="en" lang="en"><hr/><p><b>English</b></p><hr/><p class="res-header-id"><b>Generated Narrative: Requirements SGAuthoring.Skills.PlanIterations</b></p><a name="SGAuthoring.Skills.PlanIterations"> </a><a name="hcSGAuthoring.Skills.PlanIterations"> </a><div style="display: inline-block; background-color: #d9e0e7; padding: 6px; margin: 4px; border: 1px solid #8da1b4; border-radius: 5px; line-height: 60%"><p style="margin-bottom: 0px"/><p style="margin-bottom: 0px">Profile: <a href="StructureDefinition-SGRequirements.html">SMART Guidelines Requirements</a></p></div><p>These requirements apply to the actor <a href="ActorDefinition-SGAuthoring.Persona.ProgrammeManager.html">Programme Manager</a></p><table class="grid"><tr><td><b><a name="ITERATE-01"> </a></b>Maintain DAK backlog</td><td>SHALL</td><td><div><p>Can create and maintain a prioritized, estimated backlog of work items, decomposing big items into smaller items accomplishable in days.</p>
</div></td></tr><tr><td><b><a name="ITERATE-02"> </a></b>Plan iteration scope</td><td>SHALL</td><td><div><p>Can plan fixed-length iterations (1 month or less) considering team capacity, prior results, and backlog items.</p>
</div></td></tr><tr><td><b><a name="ITERATE-03"> </a></b>Define iteration goals</td><td>SHALL</td><td><div><p>Can define iteration goals that create coherence and focus for the team during each sprint.</p>
</div></td></tr><tr><td><b><a name="ITERATE-04"> </a></b>Facilitate retrospectives</td><td>SHOULD</td><td><div><p>Can facilitate retrospective meetings to assess what went well, identify problems, and improve team effectiveness.</p>
</div></td></tr><tr><td><b><a name="ITERATE-05"> </a></b>Draft project roadmap</td><td>SHALL</td><td><div><p>Can draft a project roadmap with estimates for each phase and key milestone dates.</p>
</div></td></tr></table></div><div xml:lang="fr" lang="fr"><hr/><p><b>French</b></p><hr/><p class="res-header-id"><b>Narratif généré : Requirements SGAuthoring.Skills.PlanIterations</b></p><a name="fr-SGAuthoring.Skills.PlanIterations"> </a><a name="fr-hcSGAuthoring.Skills.PlanIterations"> </a><div style="display: inline-block; background-color: #d9e0e7; padding: 6px; margin: 4px; border: 1px solid #8da1b4; border-radius: 5px; line-height: 60%"><p style="margin-bottom: 0px"/><p style="margin-bottom: 0px">Profil: <a href="StructureDefinition-SGRequirements.html">SMART Guidelines Requirements</a></p></div><p>Ces exigences s'appliquent à l'acteur <a href="ActorDefinition-SGAuthoring.Persona.ProgrammeManager.html">Programme Manager</a></p><table class="grid"><tr><td><b><a name="fr-ITERATE-01"> </a></b>Maintain DAK backlog</td><td>SHALL</td><td><div><p>Can create and maintain a prioritized, estimated backlog of work items, decomposing big items into smaller items accomplishable in days.</p>
</div></td></tr><tr><td><b><a name="fr-ITERATE-02"> </a></b>Plan iteration scope</td><td>SHALL</td><td><div><p>Can plan fixed-length iterations (1 month or less) considering team capacity, prior results, and backlog items.</p>
</div></td></tr><tr><td><b><a name="fr-ITERATE-03"> </a></b>Define iteration goals</td><td>SHALL</td><td><div><p>Can define iteration goals that create coherence and focus for the team during each sprint.</p>
</div></td></tr><tr><td><b><a name="fr-ITERATE-04"> </a></b>Facilitate retrospectives</td><td>SHOULD</td><td><div><p>Can facilitate retrospective meetings to assess what went well, identify problems, and improve team effectiveness.</p>
</div></td></tr><tr><td><b><a name="fr-ITERATE-05"> </a></b>Draft project roadmap</td><td>SHALL</td><td><div><p>Can draft a project roadmap with estimates for each phase and key milestone dates.</p>
</div></td></tr></table></div><div xml:lang="ar" lang="ar"><hr/><p><b>Arabic</b></p><hr/><p class="res-header-id"><b>السرد المُنشأ: Requirements SGAuthoring.Skills.PlanIterations</b></p><a name="ar-SGAuthoring.Skills.PlanIterations"> </a><a name="ar-hcSGAuthoring.Skills.PlanIterations"> </a><div style="display: inline-block; background-color: #d9e0e7; padding: 6px; margin: 4px; border: 1px solid #8da1b4; border-radius: 5px; line-height: 60%"><p style="margin-bottom: 0px"/><p style="margin-bottom: 0px">الملف الشخصي: <a href="StructureDefinition-SGRequirements.html">SMART Guidelines Requirements</a></p></div><p>تنطبق هذه المتطلبات على الممثل <a href="ActorDefinition-SGAuthoring.Persona.ProgrammeManager.html">Programme Manager</a></p><table class="grid"><tr><td><b><a name="ar-ITERATE-01"> </a></b>Maintain DAK backlog</td><td>SHALL</td><td><div><p>Can create and maintain a prioritized, estimated backlog of work items, decomposing big items into smaller items accomplishable in days.</p>
</div></td></tr><tr><td><b><a name="ar-ITERATE-02"> </a></b>Plan iteration scope</td><td>SHALL</td><td><div><p>Can plan fixed-length iterations (1 month or less) considering team capacity, prior results, and backlog items.</p>
</div></td></tr><tr><td><b><a name="ar-ITERATE-03"> </a></b>Define iteration goals</td><td>SHALL</td><td><div><p>Can define iteration goals that create coherence and focus for the team during each sprint.</p>
</div></td></tr><tr><td><b><a name="ar-ITERATE-04"> </a></b>Facilitate retrospectives</td><td>SHOULD</td><td><div><p>Can facilitate retrospective meetings to assess what went well, identify problems, and improve team effectiveness.</p>
</div></td></tr><tr><td><b><a name="ar-ITERATE-05"> </a></b>Draft project roadmap</td><td>SHALL</td><td><div><p>Can draft a project roadmap with estimates for each phase and key milestone dates.</p>
</div></td></tr></table></div><div xml:lang="zh" lang="zh"><hr/><p><b>Chinese</b></p><hr/><p class="res-header-id"><b>Generated Narrative: Requirements SGAuthoring.Skills.PlanIterations</b></p><a name="zh-SGAuthoring.Skills.PlanIterations"> </a><a name="zh-hcSGAuthoring.Skills.PlanIterations"> </a><div style="display: inline-block; background-color: #d9e0e7; padding: 6px; margin: 4px; border: 1px solid #8da1b4; border-radius: 5px; line-height: 60%"><p style="margin-bottom: 0px"/><p style="margin-bottom: 0px">Profile: <a href="StructureDefinition-SGRequirements.html">SMART Guidelines Requirements</a></p></div><p>These requirements apply to the actor <a href="ActorDefinition-SGAuthoring.Persona.ProgrammeManager.html">Programme Manager</a></p><table class="grid"><tr><td><b><a name="zh-ITERATE-01"> </a></b>Maintain DAK backlog</td><td>SHALL</td><td><div><p>Can create and maintain a prioritized, estimated backlog of work items, decomposing big items into smaller items accomplishable in days.</p>
</div></td></tr><tr><td><b><a name="zh-ITERATE-02"> </a></b>Plan iteration scope</td><td>SHALL</td><td><div><p>Can plan fixed-length iterations (1 month or less) considering team capacity, prior results, and backlog items.</p>
</div></td></tr><tr><td><b><a name="zh-ITERATE-03"> </a></b>Define iteration goals</td><td>SHALL</td><td><div><p>Can define iteration goals that create coherence and focus for the team during each sprint.</p>
</div></td></tr><tr><td><b><a name="zh-ITERATE-04"> </a></b>Facilitate retrospectives</td><td>SHOULD</td><td><div><p>Can facilitate retrospective meetings to assess what went well, identify problems, and improve team effectiveness.</p>
</div></td></tr><tr><td><b><a name="zh-ITERATE-05"> </a></b>Draft project roadmap</td><td>SHALL</td><td><div><p>Can draft a project roadmap with estimates for each phase and key milestone dates.</p>
</div></td></tr></table></div><div xml:lang="ru" lang="ru"><hr/><p><b>Russian</b></p><hr/><p class="res-header-id"><b>Сгенерированный нарратив: Requirements SGAuthoring.Skills.PlanIterations</b></p><a name="ru-SGAuthoring.Skills.PlanIterations"> </a><a name="ru-hcSGAuthoring.Skills.PlanIterations"> </a><div style="display: inline-block; background-color: #d9e0e7; padding: 6px; margin: 4px; border: 1px solid #8da1b4; border-radius: 5px; line-height: 60%"><p style="margin-bottom: 0px"/><p style="margin-bottom: 0px">Профиль: <a href="StructureDefinition-SGRequirements.html">SMART Guidelines Requirements</a></p></div><p>Эти требования распространяются и на актера <a href="ActorDefinition-SGAuthoring.Persona.ProgrammeManager.html">Programme Manager</a></p><table class="grid"><tr><td><b><a name="ru-ITERATE-01"> </a></b>Maintain DAK backlog</td><td>SHALL</td><td><div><p>Can create and maintain a prioritized, estimated backlog of work items, decomposing big items into smaller items accomplishable in days.</p>
</div></td></tr><tr><td><b><a name="ru-ITERATE-02"> </a></b>Plan iteration scope</td><td>SHALL</td><td><div><p>Can plan fixed-length iterations (1 month or less) considering team capacity, prior results, and backlog items.</p>
</div></td></tr><tr><td><b><a name="ru-ITERATE-03"> </a></b>Define iteration goals</td><td>SHALL</td><td><div><p>Can define iteration goals that create coherence and focus for the team during each sprint.</p>
</div></td></tr><tr><td><b><a name="ru-ITERATE-04"> </a></b>Facilitate retrospectives</td><td>SHOULD</td><td><div><p>Can facilitate retrospective meetings to assess what went well, identify problems, and improve team effectiveness.</p>
</div></td></tr><tr><td><b><a name="ru-ITERATE-05"> </a></b>Draft project roadmap</td><td>SHALL</td><td><div><p>Can draft a project roadmap with estimates for each phase and key milestone dates.</p>
</div></td></tr></table></div><div xml:lang="es" lang="es"><hr/><p><b>Spanish</b></p><hr/><p class="res-header-id"><b>Generated Narrative: Requirements SGAuthoring.Skills.PlanIterations</b></p><a name="es-SGAuthoring.Skills.PlanIterations"> </a><a name="es-hcSGAuthoring.Skills.PlanIterations"> </a><div style="display: inline-block; background-color: #d9e0e7; padding: 6px; margin: 4px; border: 1px solid #8da1b4; border-radius: 5px; line-height: 60%"><p style="margin-bottom: 0px"/><p style="margin-bottom: 0px">Profile: <a href="StructureDefinition-SGRequirements.html">SMART Guidelines Requirements</a></p></div><p>These requirements apply to the actor <a href="ActorDefinition-SGAuthoring.Persona.ProgrammeManager.html">Programme Manager</a></p><table class="grid"><tr><td><b><a name="es-ITERATE-01"> </a></b>Maintain DAK backlog</td><td>SHALL</td><td><div><p>Can create and maintain a prioritized, estimated backlog of work items, decomposing big items into smaller items accomplishable in days.</p>
</div></td></tr><tr><td><b><a name="es-ITERATE-02"> </a></b>Plan iteration scope</td><td>SHALL</td><td><div><p>Can plan fixed-length iterations (1 month or less) considering team capacity, prior results, and backlog items.</p>
</div></td></tr><tr><td><b><a name="es-ITERATE-03"> </a></b>Define iteration goals</td><td>SHALL</td><td><div><p>Can define iteration goals that create coherence and focus for the team during each sprint.</p>
</div></td></tr><tr><td><b><a name="es-ITERATE-04"> </a></b>Facilitate retrospectives</td><td>SHOULD</td><td><div><p>Can facilitate retrospective meetings to assess what went well, identify problems, and improve team effectiveness.</p>
</div></td></tr><tr><td><b><a name="es-ITERATE-05"> </a></b>Draft project roadmap</td><td>SHALL</td><td><div><p>Can draft a project roadmap with estimates for each phase and key milestone dates.</p>
</div></td></tr></table></div></div>
  </text>
  <extension url="http://smart.who.int/base/StructureDefinition/SGTask">
    <valueCoding>
      <system value="http://smart.who.int/base/CodeSystem/SGTasks"/>
      <code value="userTask"/>
      <display value="User Task"/>
    </valueCoding>
  </extension>
  <extension url="http://smart.who.int/base/StructureDefinition/SGTask">
    <valueCoding>
      <system value="http://smart.who.int/base/CodeSystem/SGTasks"/>
      <code value="userTask"/>
      <display value="User Task"/>
    </valueCoding>
  </extension>
  <extension url="http://smart.who.int/base/StructureDefinition/SGTask">
    <valueCoding>
      <system value="http://smart.who.int/base/CodeSystem/SGTasks"/>
      <code value="userTask"/>
      <display value="User Task"/>
    </valueCoding>
  </extension>
  <extension url="http://smart.who.int/base/StructureDefinition/SGTask">
    <valueCoding>
      <system value="http://smart.who.int/base/CodeSystem/SGTasks"/>
      <code value="userTask"/>
      <display value="User Task"/>
    </valueCoding>
  </extension>
  <extension url="http://smart.who.int/base/StructureDefinition/SGTask">
    <valueCoding>
      <system value="http://smart.who.int/base/CodeSystem/SGTasks"/>
      <code value="userTask"/>
      <display value="User Task"/>
    </valueCoding>
  </extension>
  <extension url="http://smart.who.int/base/StructureDefinition/SGUserStory">
    <extension url="http://smart.who.int/base/StructureDefinition/SGString">
      <valueString
                   value="plan sprint iterations, maintain the backlog, and facilitate retrospectives"/>
    </extension>
    <extension url="http://smart.who.int/base/StructureDefinition/SGString">
      <valueString
                   value="DAK development proceeds in focused, time-boxed increments with continuous improvement"/>
    </extension>
  </extension>
  <url
       value="http://smart.who.int/base/Requirements/SGAuthoring.Skills.PlanIterations"/>
  <version value="0.2.0"/>
  <name value="SkillPlanIterations"/>
  <title value="Can plan iterations"/>
  <status value="draft"/>
  <experimental value="true"/>
  <date value="2026-03-20T00:42:00+00:00"/>
  <publisher value="WHO"/>
  <contact>
    <name value="WHO"/>
    <telecom>
      <system value="url"/>
      <value value="http://who.int"/>
    </telecom>
  </contact>
  <description
               value="Capability to plan sprint iterations, maintain the DAK backlog, draft the project roadmap, and facilitate retrospectives."/>
  <actor
         value="http://smart.who.int/base/ActorDefinition/SGAuthoring.Persona.ProgrammeManager"/>
  <statement>
    <key value="ITERATE-01"/>
    <label value="Maintain DAK backlog"/>
    <conformance value="SHALL"/>
    <requirement
                 value="Can create and maintain a prioritized, estimated backlog of work items, decomposing big items into smaller items accomplishable in days."/>
  </statement>
  <statement>
    <key value="ITERATE-02"/>
    <label value="Plan iteration scope"/>
    <conformance value="SHALL"/>
    <requirement
                 value="Can plan fixed-length iterations (1 month or less) considering team capacity, prior results, and backlog items."/>
  </statement>
  <statement>
    <key value="ITERATE-03"/>
    <label value="Define iteration goals"/>
    <conformance value="SHALL"/>
    <requirement
                 value="Can define iteration goals that create coherence and focus for the team during each sprint."/>
  </statement>
  <statement>
    <key value="ITERATE-04"/>
    <label value="Facilitate retrospectives"/>
    <conformance value="SHOULD"/>
    <requirement
                 value="Can facilitate retrospective meetings to assess what went well, identify problems, and improve team effectiveness."/>
  </statement>
  <statement>
    <key value="ITERATE-05"/>
    <label value="Draft project roadmap"/>
    <conformance value="SHALL"/>
    <requirement
                 value="Can draft a project roadmap with estimates for each phase and key milestone dates."/>
  </statement>
</Requirements>